Quality controlled during execution.
Quality control follows the work from preparation to handover: what is approved, inspected and recorded at each stage.

Quality controlled during execution.
Quality control follows the work from preparation to handover: what is approved, inspected and recorded at each stage.
Procedures proposed for each project. Ekton Construction does not claim ISO certifications until they are obtained and verifiable.
- Q-01
Inspection & Test Plans
Inspection points, tests and responsibilities defined per activity.
- Q-02
Method Statements
Method, resources and sequence for each relevant work item.
- Q-03
Material Approval
Submission and approval of materials before use.
- Q-04
Inspection Requests
Formal inspection requests before moving to the next stage.
- Q-05
Non-Conformance Reports
Recording, treatment and close-out of non-conformances.
- Q-06
Punch Lists
Outstanding items checked before acceptance.
- Q-07
As-Built Documentation
Drawings reflecting what was actually built.
- Q-08
Handover
Organised handover of documents, warranties and manuals.