
Planning & Project Controls
Integrated planning, progress measurement and cost control that turn project records into a reliable basis for delivery decisions.
Discuss Your ProjectILLUSTRATIVE IMAGE · NOT AN EKTON PROJECT
01 / Service Overview
A clear basis for project decisions.
Planning and project controls establish the relationship between what must be delivered, when it should be completed and the resources and cost required. A credible programme connects engineering, procurement, construction and commissioning through logical dependencies, realistic durations and clearly defined milestones.
Clients need more than a periodically updated schedule. They need consistent evidence of physical progress, early visibility of constraints and a forecast that explains changes in the expected completion date and final cost. Ekton Construction can develop the control framework, establish a baseline and support regular analysis and reporting throughout execution.
Control arrangements are proportionate to the project and its reporting requirements. Schedule, cost and progress information use compatible coding and a common reporting date, so variances can be explained and corrective actions assessed without confusing expenditure with physical achievement.
02 / Scope of Services
Defined scope. Coordinated execution.
The following areas form a basis for discussion. Responsibilities, boundaries and acceptance requirements are agreed for each project.
Planning & baseline development
Define the work breakdown structure, calendars, activity logic, durations and milestones. The approved baseline records the agreed delivery plan and its assumptions, providing a stable reference for measuring change rather than a moving target.
Progress, cost & performance control
Establish quantity-based or milestone-based progress rules and reconcile achievement with budget and actual cost. Where appropriate, earned value analysis compares planned work, completed work and expenditure to distinguish schedule variance from cost efficiency.
Forecasting, delay & recovery
Review the remaining critical path, resource constraints and procurement exposure to forecast completion. Assess delay events using contemporaneous records and a contract-appropriate method; evaluate recovery options against feasibility, cost and execution risk.

03 / What We Do
The work behind the service.
Build and assure the integrated schedule
Connect discipline and contractor programmes, then review missing logic, inappropriate constraints and calendar assumptions. Critical path analysis identifies the activities that govern completion; float indicates flexibility but must be interpreted in the contractual and execution context.
Measure physical progress consistently
Agree measurement rules before reporting starts. Installed quantities, accepted milestones and verified records support progress updates, while look-ahead schedules expose short-term workfront constraints.
Control commitments, actuals and changes
Track budget allocation, commitments, actual expenditure and approved changes. Reconcile data sources and develop estimates to complete so the forecast final cost reflects remaining scope and emerging exposure.
Explain variance and recommend action
Use progress trends, schedule analysis and cost evidence to explain deviations. Recovery planning tests resequencing, resource adjustments and acceleration, documenting assumptions and trade-offs for client decisions.
04 / Our Approach
A practical, controlled delivery process.
Our approach is adapted to the project stage, available information and the client's delivery arrangements.
- 01
Define
Agree scope coding, milestones, data sources and reporting needs.
- 02
Baseline
Develop and approve the schedule, budget and measurement basis.
- 03
Measure
Collect verified progress and cost at a common reporting date.
- 04
Analyse
Explain variance, critical paths and forecast exposure.
- 05
Respond
Assess corrective actions and monitor their effectiveness.
05 / Key Deliverables
Evidence, clarity and usable outputs.
Deliverables are defined at engagement and tailored to the contract, project standards and intended users. Each output has a clear purpose in controlling or accepting the work.
- Basis of schedule & baseline programme
- Records calendars, logic, assumptions and milestones so the delivery plan can be reviewed and changes traced.
- Progress measurement procedure
- Defines weights, quantities, acceptance evidence and reporting responsibilities for consistent achievement measurement.
- Schedule updates & look-ahead reports
- Show the current outlook, critical activities and immediate constraints requiring action.
- Cost and performance reports
- Explain budget, actuals, commitments, progress trends and forecast final cost; earned value indicators are included where suitable.
- Delay & recovery assessments
- Document event chronology, programme effects and practicable response options with their underlying assumptions.
06 / Practical Applications
How the service applies to a project.
These scenarios illustrate potential applications of the service. They are not claims about projects completed by Ekton Construction.
Industrial equipment delivery
Integrate vendor engineering, fabrication and transport with foundation readiness and installation. A revised delivery date is analysed against the remaining critical path before recovery measures are selected.
Road and infrastructure programme
Coordinate earthworks, drainage and pavement work with access and weather constraints. Quantity-based progress identifies whether actual production can support the required completion milestones.
Multi-contractor building project
Align structure, building services and finishing programmes. Shared progress rules and interface milestones help the client distinguish genuine completion from expenditure or reported activity.
07 / Related Services
Connected capabilities.
Discuss Your Requirements
Define the right scope for your project.
Tell us about your project location, stage, technical requirements and expected deliverables. With a presence in Angola, Singapore and the USA, we support projects primarily across Africa.
