Project information in service of execution.
We use data and digital tools to plan, measure and control projects, and to give clients a clear view of site status.
Illustrative image
- PI-01
Project Planning
Activity-based schedules with milestones, dependencies and critical path.
- PI-02
Progress Monitoring
Physical progress measured by work front and compared with plan.
- PI-03
Cost Control
Budget, commitments, incurred cost and forecast final cost.
- PI-04
Risk Management
Risk register with owners, likelihood, impact and actions.
- PI-05
Document Control
Revisions, transmittals and approvals with traceability.
- PI-06
Information Governance
Rules for numbering, access and retention of project information.
- PI-07
BIM and digital coordination
Models and digital coordination of disciplines, where applicable.
- PI-08
Reporting & Dashboards
Periodic reports and dashboards with the KPIs agreed with the client.
Demo dashboard
Simulated data for demonstration. It does not represent a real project or Ekton Construction results.
Lobito Industrial Logistics & Deepwater Marine Terminal [LILET]
Lobito, Angola | ISBL — Marine & Berthing EPC | OSBL — Rail & Bulk Logistics EPC | Data as of May 2026
Physical Progress
46.4%
▼ 3.6% vs plan
CPI
0.98
Over budget
SPI
0.93
Behind schedule
TCPI
1.02
Required to complete within approved budget
Safety – LTIR
0.08
▼ -0.02 · per 200k hrs
Open Punch Items
138
ISBL 72 | OSBL 66
Forecast COD
Q4 2026
Current forecast
EV $195M|AC $199M|PV $210M|CV -$4M|SV -$15M|EAC $428M|BAC $420M
Physical Progress S-Curve
Cumulative Cost – USD Million
Top 5 Variances by Unit
| Unit | Variance Type | Planned | Actual | Variance | Status |
|---|---|---|---|---|---|
| SHIPLD | Schedule | Baseline | Current | +42 days | Critical |
| RAILLP | Schedule | Baseline | Current | +42 days | Critical |
| BERTH1 | Schedule | Baseline | Current | +25 days | High |
| SUBSTN | Schedule | Baseline | Current | +25 days | High |
| FUELTK | Schedule | Baseline | Current | +17 days | High |
MC Progress by System Type
Mechanical Completion · Check Sheet APrimary disciplines responsible for Check Sheet A – Mechanical Completion.
Unit & System Register – Execution Control View
| Unit Code | Unit Name | Type of System | Key Systems | Const. Resp. | Comm. Resp. | Cross-boundary | Progress % | MC Discipline |
|---|---|---|---|---|---|---|---|---|
| BERTH1 | Deepwater Berth 1 | Marine | Piled quay / Fenders / Bollards | Marine EPC | Marine EPC | No | 46% | MARCIVSTR |
| BERTH2 | Bulk Berth 2 | Marine | Quay deck / Mooring / Dredged pocket | Marine EPC | Marine EPC | No | 38% | MARCIV |
| SHIPLD | Shiploader System | Bulk Handling | Travelling shiploader / Rails / Cable reel | Marine EPC | Marine EPC | Yes | 31% | MECELEINS |
| CONVEY | Jetty Conveyor Gallery | Bulk Handling | Belt conveyors / Transfer towers / Dust | Marine EPC | Marine EPC | Yes | 44% | STRMECELE |
| SILOS | Bulk Storage Silos | Bulk Handling | Silos / Reclaim / Weighbridge | Logistics EPC | Logistics EPC | Yes | 57% | CIVSTRMEC |
| RAILLP | Rail Loop & Car Dumper | Rail | Track / Car dumper / Signalling | Logistics EPC | Logistics EPC | Yes | 39% | CIVMECTEL |
| RAILYD | Rail Marshalling Yard | Rail | Sidings / Turnouts / Lighting | Logistics EPC | Logistics EPC | No | 62% | CIVELE |
| SUBSTN | 60 kV Main Substation | Power | HV / MV / Transformers / UPS | Logistics EPC | Logistics EPC | Yes | 52% | ELEINS |
| SHOREP | Shore Power & Lighting | Power | MV feeders / High-mast lighting | Marine EPC | Marine EPC | Yes | 35% | ELE |
| DESAL | Desalination & Industrial Water | Utility | RO / Storage tanks / Distribution | Logistics EPC | Logistics EPC | No | 68% | PIPMECELE |
| FUELTK | Fuel & Bunkering Tank Farm | Utility | Tanks / Bunker lines / Fire water | Logistics EPC | Logistics EPC | Yes | 41% | PIPMECINS |
| SCADA | Terminal Control & SCADA | Utility | TOS / SCADA / CCTV / Fibre | Logistics EPC | Joint | Yes | 29% | INSTEL |
| ADMIN | Admin, Workshops & Gate | Buildings | Offices / Workshop / Gate complex | Logistics EPC | Logistics EPC | No | 71% | CIVSTRELE |
Critical Interfaces – Marine ↔ Onshore
| Interface | From | To | Owner | Status |
|---|---|---|---|---|
| Jetty conveyor tie-in | CONVEY | SILOS | Logistics EPC | In progress |
| Shore power 11 kV | SUBSTN | SHOREP | Logistics EPC | On track |
| Shiploader rails | BERTH1 | SHIPLD | Marine EPC | Critical |
| Car dumper feed | RAILLP | SILOS | Joint | In progress |
| SCADA / TOS integration | SCADA | All ISBL | Joint | Defining |
Top 5 Risks & Mitigation
| Risk | Prob./Impact | Owner | Mitigation | Trend |
|---|---|---|---|---|
| Marine pile refusal at Berth 1 | H/H | Marine EPC | Pile driveability review | |
| Shiploader delivery slippage | M/H | Marine EPC | Expedite FAT & shipping | |
| Dredging window conflict | M/M | Marine EPC | Resequence dredge plan | |
| Rail signalling acceptance | M/H | Logistics EPC | Early SAT with operator | |
| 60 kV grid connection date | L/H | Logistics EPC | Temporary generation plan |
Open Punch Items & Actions – Next 30 Days
| Action | Responsible | Due | Status |
|---|---|---|---|
| Close shiploader rail survey NCR | Marine EPC | 12 Jun | In progress |
| Submit dredge spoil permit | Marine EPC | 30 May | Overdue |
| FAT – car dumper drives | Logistics EPC | 10 Jun | On track |
| Energise MV switchboard | Logistics EPC | 05 Jun | Completed |
| Freeze SCADA I/O list | Joint | 25 Jun | Not started |
Total open punch items: 138 | ISBL: 72 | OSBL: 66