Quality controlled during execution.

Quality control follows the work from preparation to handover: what is approved, inspected and recorded at each stage.

Quality inspector measuring a concrete column
Illustrative image
§Q.1Quality Management

Quality controlled during execution.

Quality control follows the work from preparation to handover: what is approved, inspected and recorded at each stage.

Procedures proposed for each project. Ekton Construction does not claim ISO certifications until they are obtained and verifiable.

  1. Q-01

    Inspection & Test Plans

    Inspection points, tests and responsibilities defined per activity.

  2. Q-02

    Method Statements

    Method, resources and sequence for each relevant work item.

  3. Q-03

    Material Approval

    Submission and approval of materials before use.

  4. Q-04

    Inspection Requests

    Formal inspection requests before moving to the next stage.

  5. Q-05

    Non-Conformance Reports

    Recording, treatment and close-out of non-conformances.

  6. Q-06

    Punch Lists

    Outstanding items checked before acceptance.

  7. Q-07

    As-Built Documentation

    Drawings reflecting what was actually built.

  8. Q-08

    Handover

    Organised handover of documents, warranties and manuals.